DESIGN & CONSTRUCT PROJECT
This new lime storage and dosing facility in central New South Wales is an excellent example of turnkey contracting by Techniplan. The plant was designed, manufactured and erected by Techniplan personnel to a stringent performance specification required by the New South Wales Public Works Department.
INNOVATIVE MULTI DISCIPLINED DESIGN SOLUTIONS
Hydrated lime is a difficult material to handle and Techniplan's design includes a mass flow bin, bin agitation unit, screw feeder, water dissolution and slurry pump. The plant is fully automatic and features state of the art weighing cells, and all electrical interlocks, to ensure plant integrity and operator safety under all conditions. Techniplan's modular construction technique offers a cost effective alternative to the traditional construction methods.
PLANT OPERATION
Lime is accurately measured by a volumetric screw feeder and discharged automatically from the 30 tonne bulk storage bin. The volume of lime fed to the mixing tank is governed directly by a signal proportional to the flow in the main water supply pipe. The lime powder is mixed by an electric agitator operating in the mixing tank to form a slurry which is then pumped directly to the main pipeline by means of a positive displacement cavity pump.
SPECIFICATIONS

Plant Capacity 30ml/day
Dosage Rate 0-50mg/l
Plant Storage 30 tonnes


SPECIFICATIONS
Silo Capacity: 30 tonnes
Dosing Rate: 5-60 kg/hr
Plant Capacity: 400 ML/d
LIME STORAGE AND DOSING PLANT
Lime storage and dosing facilities were built for the ACT Electricity and Water supply authority at Mt. Stromlo water treatment works. The facility consists of a new 30 tonne storage silo for handling bulk lime from road tankers. Two streams of lime are taken from the silo and metered into intermediate holding hoppers. The lime is then accurately dispensed from the intermediate hoppers via volumetric feeders into mixing tanks where the lime is dissolved in water. The concentrated lime slurry solution is then pumped to the two dosing points in the water treatment plant. The system is accurately controlled by a PLC using PH measuring devices and flow pacing signals to determine the feed rates and dosing rates.

LIME STORAGE PLANT
Lime storage and transfer facilities were built for The Gold Coast City Council at its Mudgeeraba water treatment works. The facility consists of a new 30 tonne storage silo for handling bulk lime from road tankers. A screw conveyor transfer system feeds the lime from the new silo and distributes it to three existing day hoppers. Three manual bag loading facilities were constructed so that lime can now be accepted in 20 Kg bag form. The contents of the silo are determined by weigh cells on the hopper structure, with continuous read out of the level in the water treatment plant control room. The silo and the three bag loaders are equipped with a dust collection system providing a clean environment for workers in the plant.

SPECIFICATIONS

Silo Capacity: 30 tonnes
Transfer Rate: 2 tonnes/hour
Plant Capacity: 50 ML/d


SPECIFICATIONS
Silo Capacity: 30 tonnes
Dosing Rate: 20 & 60 mg/L
 

LIME & ALUM DOSING PLANT
Lime & Alum storage and dosing facilities were built for Mackay City Council. The facility consists of a new 30 tonne storage silo for handling bulk lime from road tankers. A vibratory feeder transfers the lime from the silo and distributes it to two day bins. A volumetric feeder transfers the mixed contents from an agitator into the dosing point.

SPECIFICATIONS

Tank Capacity: 40,000 Litre each (aluminium sulphate)

1,000 Litre (poly aluminium chloride)
Dosing Rate: 42-126 mg/L


[Home] [Bulk Conveying] [Railway Maintenance] [Shiploading & Stockpiling] [Train Loading] [Cranes & Lifting Equipment]
[Design Services] [Forum] [Email Us] [Contact Details]
www.techniplan.net
Techniplan
- Mechanical and Structural Engineers

Suite 1, 3rd Floor, 49 Sherwood Rd, Toowong, Queensland, Australia 4066
Ph: +617 3859 6800 Fax +617 3859 6899
Last Update 20 August 2007 by Jay Lu