has supplied a special purpose high performance gantry crane to
transport sleepers as part of a track strengthening project. The
Techniplan gantry crane brings new concrete sleepers from sleeper
transport wagons to a track layer and then returns with old timber
sleepers to the wagons. The crane carries 16 concrete sleepers
at a time in a specially designed spreader frame. The sleepers
are picked up from a range of heights using an automatic sequence,
and then the crane travels at approximately 3 m/second along the
train of sleeper wagons to the track layer. |
 |
|

|
The
gantry crane is mounted on eight wheels arranged in four two wheel
bogies. All wheels are chain driven by two independent hydrostatic
transmission circuits. Braking is provided by a combination of
hydrodynamic regenerative braking and fail-safe multi disc hydraulic
brakes acting directly on the wheel treads.
Hoisting is provided by two hydraulic cylinders acting through
leaf chains in 1:2 ratio, similar to a forklift system. The spreader
frame incorporates hydraulic telescoping side clamping mechanisms
for lifting the sleepers. While travelling, the spreader frame
with sleepers is mechanically latched to the gantry crane frame.
|
| The
crane is powered by a Detroit 4.53T turbocharged diesel developing
140 KW at 250Orpm. Tractive power is provided through dual piston
pumps, with a further vane pump providing hydraulic power to all
other functions. The crane is operated from an ergonometrically
designed cabin, using a PLC to control the hydraulic systems.
Several interlocks prevent machine functions from operating in
a dangerous manner, thereby ensuring a safe workplace. |
|

|
A
previous gantry crane was unable to negotiate the full range of
transition geometries between wagons and often derailed at these
points. To overcome this difficulty, Techniplan incorporated a
rock axle three point suspension.
The gantry crane is a fine example of Techniplan's ability to
design and develop complex materials handling machinery on a custom
designed prototype basis. The project was undertaken on a fixed
price, lump sum basis and completed within 26 weeks. |
|
Machine
weight
Safe Working load
Installed Power
Travel Speed
Sleeper loading
Cycle time
Production rate
|
12
tonnes
7 tonnes
140 KW
3 m/sec
16 x 250 Kgs
120 seconds
10 sleepers/m
|
|
|
 |
This Gantry Crane
was designed to be used on the Alice Springs to Darwin railway
line, and when completed to be used for NSW Rail Infrastructure.
The machine is gauge convertible to both wagon sizes. |
|
|
Techniplan refurbished the 20
year old wreck (on the right) into the newly reconditioned
state below. This machine ended up being used on the Alice
Springs to Darwin railway line, and also modified to be
gauge convertible.
|

 |